NEW STAGES AND TECHNICAL OVERVIEW:
• Stage 1 allows for up to 1000 MW of the national load to be shed
• Stage 2 allows for up to 2000 MW of the national load to be shed.
• Stage 3 allows for up to 3000 MW of the national load to be shed.
• Eskom Twitter account: @Eskom_SA
• Eskom Facebook page: Eskom Hld SOC Ltd